Dunlap Hall Addition & Alterations Project

This $13.5M project replaces the existing aging guardrails around the pedestrian walkways on all levels of Dunlap Hall, removes the old existing elevator and replaces it with a new dual elevator system on the exterior South side of the building, completely renovates the existing restrooms, and provide a new monumental stairway to the second floor. (Opened Winter 2016)