Polytechnic HS Auditorium AB300 (seismic upgrade)
Upgrades to the $14M auditorium include seismic upgrades to existing structure, installation of a new elevator, wheel chair lifts, new restrooms, stage lighting, plumbing, heating/air conditioning, fire alarm/sprinklers, boiler, ceiling, roofing, seating and interior finishes (drywall, paint, carpet, ceramic tile, etc.).