The Poly Project
The Track and Field Project at Poly High School included the removal of the existing running track, sports field and an addition of a new 400 meter synthetic running track with a new all-weather sports field to meet CIF High School regulations. Project also included installation of a new long jump, triple jump, high jump and pole vault runways. Project Budget $6.3M, opened Fall 2018.
The Bleacher portion of the project consisted of demolition of existing concrete bleacher structure, construction of 1,405 seat grandstand bleachers with a press box. Project also included four new high output sports lights / poles with some minor alterations to the site (including paving, drinking fountains, chain link fences, gates, and ADA accessibility upgrades). Project Budget $2.9M, open Fall 2019.